Pages

Showing posts with label Skelf. Show all posts
Showing posts with label Skelf. Show all posts

Friday, 22 May 2015

FO: Three Purple Garments

Hello. My name is Jenny and I'm addicted to purple. Or I am, at least, firmly in a purple phase...


Since I last wrote regularly, I have been knitting quite a bit - though not, I confess, three garments' worth! I worked on these one after the other over many months, but it just happens that all the finishing, blocking, and button-attaching has happened in the course of the last week.


First up, the Simplicity cardigan by Mary Arranella [rav link] in easyknit's Slink in the colour Viola. This laceweight cardi only took me six weeks and one skein of yarn to knit. I enjoyed knitting it a lot, and it wasn't very complicated. I'm hoping it will be a useful, versatile garment that I can wear to work or just around the house, when I get a little cool. Open or tied together:




Next, Thermal by Laura Chau, from Knitty Winter 2006, in Jarol Wool Rich Heritage 4ply, bought from my new LYS, Wool for Ewe. Also an enjoyable knit, though the finished product has come out a bit long in the sleeves for my liking. I'm thinking about revisiting that button band, because I think the neck is a bit wide/low for me and it just doesn't sit right, but then I need to figure out how to fix the 'sitting right' thing (go down a needle size, cast off more tightly, or something. The whole thing took me a year to knit, so I'm going to have to gear up for a revisit. 


And finally Skelf by Ysolda Teague [rav link], knitted in King Cole Merino Blend Aran in Lavender, bought from the soon-to-close Mill Shop at Texere Yarns. According to ravelry, I cast this on in July 2012, and while there have been some trials and tribulations including a massive rip back when I decided it was just the wrong damn size, I have spent maybe a year trying to find the right buttons. I think these will do, but I have a few options in my button box if I change my mind. Again the sleeves are a little long for me, but giveen that it's a cosy aran-weight jumper I can probably cope with that. Lovely fit and interesting construction, if I wear it enough I might knit a second; I'll just make sure I get the yarn and the buttons together this time ;)


Thanks for stopping by!

Wednesday, 28 August 2013

WIP Walk of Shame*

The number of WIPs is getting a bit out of control (for me) these days. Officially, there are ten (!!) things that are not totally finished, or that I'm not totally happy with.

Back in the fold for the past few weeks has been Lauriel. I've been putting off reinforcing the button band for months now, but have finally bitten the bullet and started sewing (using this Knitmore Girls video). The saga of this cardigan has been much-chronicled over the past 2 years, with problem after problem, so was condemned to the naughty corner. Now back in the fold, and fingers crossed I can get it finished before we lose the light evenings.


Skelf has also had a few stumbles on the way; nothing big enough for the naughty corner, but a few time-outs were needed. It's getting big enough that it's difficult to take out and about (where most of the knitting happens these days), and is large enough that it can get a bit too warm to knit in the summer.... excuses, excuses, I know! A slightly cooler week just gone means I've progressed it,  doing the neckline (again) and hoping that we will be ready to do the cast off at the shoulders before too long! [Apologies for the focus on this photo - proper photos when it's finished!].


I've made some good progress on the Vorticity socks I cast on on holiday, though progress has stalled a bit as I don't have enough brainpower at the moment. I am really enjoying the pattern and the yarn, and the two work brilliantly together.


I've also been knitting a shawl, accidentally, as it is not part of the my Knit The Queue plans - oops! I'll tell you the story from beginning to end in a future post. It is very compelling knitting, and progress is good.


I'm also knitting some grey man socks - more on why another day. They are standard vanilla socks in Regia 4ply, that I got with a whole load of other 'man sock yarn' in the Hobbycraft sale. Some excellent mindless knitting, though not currently my favourite project.


The navy and white gloves for OH are not merely on a go-slow as I said in July, but have actually stopped moving at all. Hopefully, taking them away with me this weekend to see said OH will bring back the magic.


Then, there are a few things that are in actual hibernation. First up, we have The Socks With No More Yarn, which I'm still gutted about. However, this week I have actually managed to face them, and get myself stash surfing on ravelry. Fingers crossed, I might actually be able to finish them before too long!


Next up, a glove in yarn that was a present, of which there is only one and I'm not sure I have enough yarn to knit a second one. I'm going to have a bit of an assess (and time with the kitchen scales), and see if we can manage it. Else maybe rip back and turn it into a headband-type thing. 


A hat that I made up the pattern for, but is too short for me. I have more yarn, I just have to rip back to before the decreases. However, it was knitted to match my seriously cold-weather-only coat, which didn't wear at all last year. I reckon that might change this year as I might be further north, so guess I'd better sort this one out as well.


And finally, mittens that are too short at the cuffs. These are waiting on me to finish with some white/cream DK, either from the navy gloves above or from last post's Waterhouse Mitts [rav pattern link]. I then intend to use that to pick up stitches, knit a little stripe and then return to purple. Don't worry, it will sort of match the hat.


So there we have my WIP walk of shame. A lot of it is psychological problems of not being able to face picking up a project that I thought I'd finished, but if I actually want to be able to use the stuff I guess I'd better get cracking!

*With thanks to Steph for the title of this post.

Sunday, 14 July 2013

Holiday Knitting Plans


Dear readers, I have a quandary. I am going away for a few days but none of my projects are ideal. Let me review for you:


First up, Skelf. This is on hiatus until this warm weather ends - it's just too hot to sit with most of a worsted-weight jumper on your lap! [Yes I will keep thinking of excuses not to knit it.] Even if it were cooler, it is not sensible to take an entire jumper away for a week - unless I'd have a lot of knitting time. We're flying to a city break. Next!

The gloves I'm knitting for OH are also on a go-slow. I'm not enjoying these at all at the moment; scared of running out of yarn and keep having to rip back every time I knitted a finger, he tried it on and it was too small. Lost the loving feeling, but at least OH will be on the holiday to keep trying them on - though as I said, it is quite warm at the moment and whether he will want to try them on is another matter!


My blue criss-cross socks are definitely in time-out. I was doing so well and going great guns...


...and then, disaster struck:


Oh yes, that is how much yarn I have left to finish the second sock. A real moment for curse words. Shoved them into time-out until I work out what to do with them.


So what am I actually knitting at the moment, since everything is too rubbish / too hard / too big? The answer is some lovely socks, in a pattern called Kalajoki [rav pattern link] in Yarn Yard Yarn I bought two years ago. The colour is called Haar, named after the sea mist that affects the east coast of Scotland [according to Wikipedia] and it is beautiful to knit with. I'm racing through these with their just-addictive-enough pattern and slightly-larger-than-normal needles.


So now I need to decide whether to start something for the holiday. It's times like these I am glad of my approach to Knitting The Queue this year; to have a selection of projects I can choose from. I've narrowed it down to two options:

First, vorticity. This pattern and this yarn (from Wharfedale Woolworks) have been wedded together for some time. Things have been holding me back, sadly: the pattern is on 2mm needles (teeny tiny!); plus, I've mostly been going down one needle size on the sock body and two for the ribbing, which I don't own. However, now my gauge seems to have evened itself out a bit more, and so I could probably knit the body on 2mm and just slightly reduce the number of stitches in the ribbing. Ready to go!


Second, daffodil. I will admit that this yarn has been giving my pause for thought when looking at my queue. I thought I would make a classic, symmetric triangular shawl but then the pooling bugged me; it was random and chaotic (good) then pooled for ~12 rows (fine), but the two together were a bit funny-looking. Instead, we're going to try knitting a cowl with it, and hope that it doesn't flip between pooling and not, but at least picks one and sticks with it! I've got a slightly odd yardage (339yds/310m) so I've gone with the Irish Mesh Cowl [rav link], which takes 220yds/201m. So this one is ready to go, too!


What say you? Should I take two new projects away with me? Or should I be a good girl and take an old project to finish? 

Wednesday, 13 February 2013

Hangover from 2012

With this knit the queue thing, I have had a little assess of the projects that are still hanging about from last year, and two of them are jumpers.

First off, Lauriel needs a little work - the button band bulges a little about my ribcage (I know, weird place to be unusually fat, such is my lot) so I intend to reinforce it with grosgrain ribbon as in the Knitmore Girls podcast - they made a video about how to do it, by popular demand. I've been planning to do this for about a year now, just I am the master of procrastination when it comes to this cardigan; it has just kicked me one too many times and I cannot face it when there are so many other things to knit that are just as pretty and not so angry. It Just Needs Doing.


The other project I have on the go from Little Red in the City is Skelf, which I was going great guns at before Christmas, but now I've spotted a mistake and procrastinated fixing it enough to lose my place, so I didn't finish it before the new year as I'd hoped, but now it languishes in my knitting bag, also lurking. 


And a third project that has been on the back burner - this is probably a record for me, all be it a depressing one - are the lovely if slightly mad socks I mentioned in my Socktopus post, the magenta ones. I had to ad-lib a bit when it came to sorting out the heel, and there was a big pause while I (freaked out about) carefully considered what to do, as I'm not normally one for deviating from the pattern, especially if it's a pattern I've paid money for. Still, we now have one sock (though sadly no photos as it's for someone who might be reading this), and hoping to cast on the second one for the weekend's train rides.

All this did make be take a bit of a look at the queue. Somehow we are back down at 18 projects, having been at the dizzying heights of 25. Now, I know I finished two last week, I've cast on another two, but we still have two unaccounted for. Clearly, whatever they were, I wasn't that enamored with them as I've totally forgotten what they were! It does seem more manageable now though - and I really want to crack on with them all.

Thursday, 12 January 2012

A Trip to Texere

On 28th December, Texere Yarns had an extra open day that I could go to. I have wanted to go for a long while after hearing good things about it, but I was still surprised at just how much yarn there was available. Fortunately, I have learned from previous trips and went prepared with a list. On a piece of scrap paper that was heading for the bin, that turned out to be a receipt from when my dad ordered his graduation gown. He's having a huge clearout but when I do that the most recent 10-20% of stuff from the top gets sorted but the stuff underneath stays in the same state. I guess this is what you find when you have a serious clearout!

I digress. In short, my mental list has five things on it; four jumpers (Angostura, Skelf, Owls, and Spoke), and the Radiating Star Blanket [rav link]. I wanted to buy the yarn for one of these, preferable two. I went with two. I figured my relatives would approve of my spending my Christmas money this way.

So the jumper plan is:

1. Owls in the Texere Yarns Chunky in Turquoise. I love the colour, and think it would show off the pattern well and suit me.


2. Skelf in King Cole Aran in Lavender. I have enjoyed making things in King Cole, it's not expensive but keeps you lovely and warm, and it not overly itchy. I hope the colour will show off the pattern and am less sure about how much it will suit me....


There will hopefully be a comprehensive knitting plan once I've worked out what that should be. I also accidentally bought a little more roving. I really, really will try to learn to spin this year!